from The Epoch Times:
A new government report has found that U.S. F-35 fighter jets are only ready for a mission about half of the time, with the remaining time spent awaiting maintenance.
On Thursday, the the Government Accountability Office (GAO) published a report (pdf) which concluded that the F-35 Lightning II Joint Strike Fighter, was only mission capable about 50 percent of the time for the A and B variants and 57 percent for the C variant of the fighter. These mission capability rates, the GAO report states, are “far below program goals” of 90 percent for the F-35A variant and 85 for the B and C variants.
TRUTH LIVES on at https://sgtreport.tv/
The F-35—which is operated by the U.S. Air Force, Navy, and Marine Corps, as well as a host of U.S. allies—is one of the most advanced systems in Western arsenals. The 5th Generation fighter jet is made with an array of special radar-absorbent materials and other “stealth” features. The multirole fighter jet boasts capabilities for a range of different mission types, and the F-35B variant operated by the Marine Corps has unique short take-off and vertical landing capabilities.